Attendees:
Lisa-Ann Oliver, Flaura’s Acres
Tom Noonan, Flaura’s Acres
Zach Slota, United Engineering
Cynthia Fuller, Commerce, Small Communities Initiative Program

  • Contract with conservation district signed.
  • Plan to set control points by the end of this week and begin mapping work next week.
  • Need to complete all work by September 30, but ideally by mid-September.
  • Surveyor will be a sub to United Engineering.
  • Need to locate for utilities
    – PUD provides electrical services
    – Water system operator can help with water line locations and work with survey crew as needed.
  • Need a meeting with residents to map out where septic tanks are.
    – Steve Smith has inspected all the septic tanks and knows locations
  • Tom will send contact information for both Dale and Steve to Zach.
  • United will send amendment to the general engineering services contract to add sewer design scope of work.
  • Need to schedule a pre-application meeting with the City’s engineer to find out what the city is going to require for connections.
  • Drainfield decommissioning – should consider including the work in this project so the property could be used or sold.
    – What are the Ecology requirements for decommissioning a drainfield?

Next Meeting
August 9, 2023 at 9 am