AGENDA

  • Welcome and Introduction
    • Introduction of board members and attendees (Jonathan)
    • Reminder about change in address to send monthly fees (Jonathan)
    • Website and what’s available (Lisa-Ann)
  • Overview of community septic system and current status (Lisa-Ann)
  • Issue with our current community septic system (Tom)
    • Photos & videos
    • Engineering report from United Engineering
    • New conditional septic permit
    • 2 phase process
      • Redesign and permitting, anticipated to be completed this year
      • Construction, to be completed in 2024
    • Connecting to the city sewer (Lisa-Ann)
      • Cost – county vs city residents
      • Annexation by the city of Sequim and process
    • Financing options (Tom)
      • Grants, loans and requirements
    • Voluntary reduction in water usage through the septic system (Lisa-Ann)
    • Community drainfield issues (Lisa-Ann)
    • Budget (Robert and Ruth)
    • Q&A (Jonathan)